Photos by Dave F.
Tuesday, August 28, 2007
Thursday, August 23, 2007
August 18th Update
Photos by Greg B.
Every hot rod needs some flame treatment, and this one is no exception. Very tasteful flames appeared over the weekend, Beautiful ! Prior to that the team worked more on engine ancillaries, mounting the radiator and lamps, steering rack, Windshield and rear view mirrors...
Every hot rod needs some flame treatment, and this one is no exception. Very tasteful flames appeared over the weekend, Beautiful ! Prior to that the team worked more on engine ancillaries, mounting the radiator and lamps, steering rack, Windshield and rear view mirrors...
Tuesday, August 21, 2007
August 20th - Update
The team assembled for another Monday night of Bucket work. There seemed to be a lot of head scratching this evening as Dave S and Steve L tried to figure out the brake pedal mounting, Mark V worked on the steering shaft routing, Toan worked on the hinges for the decklid, Mark J and Nate worked on the front drive belts and Knox sorted through the wiring....
Toan, Dave S and Steve L position the fuel tank to clear the hinges...
Toan, Dave S and Steve L position the fuel tank to clear the hinges...
Sunday, August 19, 2007
August 11th - Progress report
We really needed to get the engine installed so we could position the body shell, radiator and steering gear...Rick J and John R get the transmission mount located while Steve L and Don L
offer encouragement - Left a bit, no right, other right, now down.....Perfect !
Eyeing up radiator position and steering gear
August 6th - Progress Report
We now have something that resembles a rolling chassis, some tweaks needed to the front suspension and perhaps the most exciting things - our Body has been sprayed and the interior finished trimming - wow - they look fantastic....
Subscribe to:
Posts (Atom)